14005 Live Oak Avenue

Project Description

The Project would demolish the existing industrial office building and construct a one-story concrete tilt-up warehouse building with a mezzanine totaling 102,500 square feet. The Project would have a floor area ratio (FAR) of 0.48. The Project would be designed to be achieve Leadership in Energy and Environmental Design (LEED) Gold standards. The proposed building would include twelve (12) dock doors which would be used for truck loading and unloading in the truck yard. Vehicular access to the Project site would be provided via two (2) new 40-foot driveways: one (1) each off Rivergrade Road and Live Oak Avenue. The Project would include surface parking with sixty-five (65) parking spaces, thirteen (13) trailer stalls, and four (4) long-term and four (4) short-term bicycle spaces. Pedestrian access would be provided via a new sidewalk along the street frontages on Rivergrade Road, Stewart Avenue, and Live Oak Avenue. The Project would also include a 10-foot street easement dedication (totaling 0.27 acres) along Rivergrade Road, Stewart Avenue, and Live Oak Avenue. Project construction is anticipated to occur over one (1) phase, lasting approximately thirteen (13) months, beginning as early as the fall of 2025 and ending in the fall of 2026. Industrial operations are assumed to occur 24 hours a day, 7 days a week.

14005 Live Oak Avenue vicinity map

Notification

Notice of Availability (NOA) and Notice of Intent (NOI) - September 30, 2024

Notice of Completion (NOC) - September 30, 2024

Environmental Documents

Initial Study/Mitigated Negative Declaration (IS/MND) - September 30, 2024

Response to Comments/Mitigation Monitoring & Reporting Program (MMRP) - January 2025

Technical Appendices

Appendix A - Air Quality Assessment

Appendix B - Health Risk Assessment

Appendix C - Tree Assessment Report

Appendix D - Cultural Resources Assessment

Appendix E - Energy Calculations

Appendix F - Geotechnical Exploration Report

Appendix G - Greenhouse Gas (GHG) Emissions Assessment

Appendix H - Phase 1 and 2 ESA

Appendix I - Drainage Report

Appendix J - Low Impact Development (LID) Report

Appendix K - Acoustical Assessment

Appendix L - Traffic Impact Analysis

Appendix M - Trip Generation, Circulation and Access Queuing Memorandum

Public Hearings

March 26, 2025 (City Council)

February 19, 2025 (Planning Commission)

Staff Reports and Resolutions

March 26, 2025 (City Council)

February 19, 2025 (Planning Commission)

Contact

For more information contact:
Brandi Jones, Senior Planner at 626-430-2260 or Email Brandi Jones.